Back History of the Long Family
In the early 1970’s Ralph Long established Ralph Long and Sons, which included Ralph ( Great
Grand Father) along with his children. They quickly became a well know name in the industry,
with times changing so was their name. Window Master Windows was their new name among
the fast growth of the company. My father, Jim Long, spent many years working and building
relationships with contractors before he decided to move into the commercial glazing side of
the industry. Window Master Windows was later sold off to Jeld Wen Windows & Doors and
now can be seen in almost all hardware stores.
Innovation Academy is a fast-tracked modernization of an existing building that is being converted into a San Diego Unified School. The project general contractor is Balfour Beatty Construction.
Feaster Charter School is a fast-tracked modernization that will be completed in two months over the 2020 Chula Vista summer break. This project involves replacing existing windows with modernized storefront windows in six buildings. The project general contractor is Balfour Beatty Construction.
El Capitan Building 300 & 400 is a modernization project to update the existing staff offices and facilities. The exterior of the building is being updated with new glass entry and fixed windows around, along with wall to wall glass offices in the interior. CW Driver has teamed up with the Grossmont Union High School District and is the project manager of this project.
Portside Pier -Located in the heart of San Diego Harbor. This complete remodel and renovation of an outdated restaurant will include and showcase our touch in the glass railings, glass windscreens and glass staircases.
Fairmount & Twain -This is a two building project with Suffolk Construction, which includes a large amount of storefront systems, as well as entry doors, and restroom mirrors.
Santana High School Mini Event Center -This project is a Prevailing wage project, which is project managed by Balfour Beatty Construction. The project includes various glass colors, door entry systems, and curtainwall systems.
UTC Tower UTC Tower-Located at the Southwest corner of the Westfield UTC shopping center in University City. Working together alongside Suffolk Construction, this 23-story building is filled with both interior and exterior common spaces. Our work will include bent frameless glazing walls, glass canopies, glass entry doors, storefront systems, mirrors, and fire rated door systems.
Bedrosians Miramar-Located right down Miramar Road, the Bedrosians’ remodel project, was completed with KD Stahl. This
6,500 Sq. Ft. of showroom, offices, and site work is scoped with Storefront and entryway doors.
Lot 17 is a multi building tilt up complex with 8500 sq.ft of exterior glazing. The general contractor for this project is Hamann Construction
Block 19 is a 7 story multi-purpose building located in Oceanside, Ca. The scope of work consists of curtain wall systems, storefront, aluminum windows, multi sliding doors, sun shades, interior glazing, and railing systems throughout the building. The general contractor on this project is Ryan Companies.
Poway Stowe -This two story industrial tilt up building contracted by Hamann Co. Has many technical archways, door entry systems, as well as some tenant improvements on the interior side
Toussaint Academy located in downtown San Diego, is a Father Joe’s Village facility. This facility was looking to give the outside a face lift for a small budget. We designed a metal cladding that was installed inside and out on all four stories, that really helped make the building have a clean look.
Rancho Bernardo is a 4000 sq.ft Glazing project with BSD Builders, which includes exterior glazing, exterior panel systems, and interior glazing.
Crawford HighSchool -New Construction building with varies Curtainwall Systems, fire rated glazing, storefront systems, sound rated window systems, and glass railing. General Contractor is Turner Construction
Juvenile Justice -Phased renovation and rebuilding of existing site and facility to include new community supervision services (Juvenile Probation Center and Ohio Street), Probation, Urban Camp setting and consolidated detention for up to 350 youth and Probation Administration. General Contractor is Balfour Beatty Construction
JTarget CW -Complete renovation of an existing tilt up building, scope includes silicone glazed storefront, curtainwall, automatic doors, multi-slide doors, bi-folding doors. General Contractor is BSD Builders
Cuyamaca College Student Services -New Construction project on the existing campus of Cuyamaca College located in El Cajon, Ca. General Contractor is Soltek Pacific Construction
UCSD Marine Conservation -High Profile project for UCSD that overlooks the bluffs of La Jolla, Ca. Large custom multi-sliding doors, storefronts and all glass doors make up this project. General contractor is PCL Construction
Vantage Point is a massive two building tilt up project, which include storefront wrapping four sides of each building. The general contractor is Ryan Companies.
Marriott Carlsbad- Marriott Spring Hills Suite Carlsbad is a multi-building resort with T.B. Penick & Sons Inc. Long Glazing & Doors will be installing all storefront and entry ways throughout the complex.
Hoover High School project that is contracted by Balfour Beatty Construction. This is a large two building project which includes, curtain wall, storefront, fire rated aluminum framing, sunshades, and radius storefront framing.
John Hopkins Court -Located across the street from the Triton Track & Field Stadium and overlooking Torrey Pines South Course: Is a remodel project working closely withPrevost Construction,this 82,500-square-footbuilding will scope 2 full height curtain wall entryways.
Santa Ysabel Nature Center-Located in the Northeast corner of San Diego county. This $9.5 million 6,000-square-foot structure will be built just across the street from The Julian Pie Company near the Highway 79 and 78 intersect. Our scope will include aluminum storefront and entrances.
Palm Avenue Transitional Housing-Located in Southwest San Diego, near the beautiful Imperial Beach. With San Diego City Council approving an $11 million plan to convert a motel into a new Transitional Housing unit for Ex-convicts, this government funded building will include aluminum storefront and entrances.
Pacific Vista -This 19,000 sq.ft. glazing project is made up from three buildings. This project has it all curtainwall systems, storefront systems, door entries, wall panel systems, composite ACM panel systems, as well as tenant improvements on the interior. The contractor on this project is Ryan Companies.
Goodwill is a new construction tilt up building located in Chula Vista, Ca. The glazing scope is 3000 sq.ft. The general contractor is Hamann Construction.
Pine Ave. is a community park project located in Carlsbad, Ca. This project has 4200 sq.ft of exterior glazing with multiple various glass types and patterns frits. Barnhart-Reese construction is the general contractor for this project.
Holiday Inn Express located in downtown San Diego, was a modernization project with Dan Levy Construction which included, demoing existing window system, and replacing the windows with modern energy saving windows through the 1st, 2nd and 3rd floor of the building.
Paseo Del Norte located in Carlsbad, Ca. Is a new construction 3 story building to serve as a private medical and surgery center. We worked hand in hand with BSD Builders to help design this beautiful building. The work consists of 8500 square feet of exterior curtainwall, storefront systems and various metal panels. The interior is a industrialized storefront system, that really gives you that feeling of old industrial.
East Gate Terrace located in La Jolla, Ca. was an interior TI project with Suffolk Construction. Our scope of work included various frameless glazing systems, backlighted glass, shower doors,and hurculite doors.
Sharp Canopy is located in Coronado, Ca. We worked closely with Nielsen construction and OSHPD to safely design and install this pedestrian and vehicle canopy.
The smoke house located in Pacific Beach, Ca. is a BBQ restaurant which was completely remodeled. We had the opportunity to install varies Core 10 steel panels throughout the inside and outside of the building, which gives you the rusted aged appearance. New exterior storefront and interior storefront was also installed to give the client the clean appearance they were looking for.
The San Diego Children’s Zoo project is a massive park enhancement project, which includes over 10 exhibits and food service buildings. The exhibits include massive over size glass to enhance the experience for Zoo visitors. The general contractor on this project is Pacific Building Group.
Pride & Sycamore Elementary School -Two building addition to two separate school facilities, interior and exterior glazing along with bi-folding doors. General Contractor is Balfour Beatty Construction
Magnolia Es Modernization Multi Building New Construction project located in Carlsbad Unified School District. General Contractor is Erickson Hall Construction
Mira Costa College -Three Building design Build project which incorporates natural light through glass & Glazing to a new level. General Contractor is Balfour Beatty Construction
Gaylord Pacific -Is a large mega project for the San Diego community, LGD will be completing the interior glazing scope within the hotel and convention center. The General Contractor is a Joint Venture between McCarthy and Mortenson Construction.
Mira Costa Arts Media - The new Arts and Media Building will house a variety of functions, serving the students of the arts hub and the campus as a whole. It will include a spacious new Art Gallery, a 40-person classroom, student study spaces, faculty offices, the Media Arts labs, a coffee cart-type element, and extensive display areas for student art. It will provide dedicated student-friendly study and collaboration spaces. Proposed as a single-story facility, the building will have a strategic path of engagement to the campus promenade. The General Contractor is Balfour Beatty Construction.
Phase 2 Juvenile Justice is to expand on phase 1 campus and include additional administration facilities. The General Contractor is Balfour Beatty Construction.
Westgate Hotel -This existing 1970’s building is getting an upgrade on all room windows from Level 3-19 to help reduce the noise levels from outside sounds. Long Glazing & Doors is the acting General Contractor on this project.
Mira Costa Student Services -The new Student Services facility will consolidate student service functions currently scattered throughout the campus into a single, one-stop-shop, and will include a new home for the Veterans Center. Located in the former home of Pedley Park, the new building is strategically positioned to act as a gateway building for the campus, providing a much-needed sense of entry and easy wayfinding for new or prospective students. The building will be a two-story structure and will allow access and entry from the street level for visitors and campus promenade for current students. The General Contractor is Swinerton.
Campus at Horton -Previously known as Horton Plaza, this mass renovation and rebuild will be turning this prior mail into a mixed used complex with housing, offices, retail, tech spaces and more. The General Contractor is Turner Construction.
Chula Vista New School #48 Village 2 Is the construction of a new 2-story administration and classroom building and a food service building. The General Contractor is Balfour Beatty Construction.